ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2008, Vol. 28 ›› Issue (2): 221-224.DOI: B
• wenzhang • Previous Articles Next Articles
WEN Quan1, ZHANG Jie1, CHEN Bin2
Received:
Revised:
Online:
Published:
Abstract:
On basis of analyzing the geology and stability of the landslide section at the exit of Zhulinping tunnel, the spatial relationship between the tunnel and the landslide body and the influence of tunnel construction on the landslide body, the authors present the construction technology for the landslide tunnel section in terms of surface grouting, advance reinforcement, excavation, primary reinforcement and lining in the paper, which can provide reference for similar works in the future.
CLC Number:
U455
U216
WEN Quan, ZHANG Jie, CHEN Bin. Construction Technology for Landslide Tunnel Section: Case Study on Exit Section of Zhulinping Tunnel[J]. Tunnel Construction, 2008, 28(2): 221-224.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2008/V28/I2/221