ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2008, Vol. 28 ›› Issue (4): 418-422.DOI: B

• wenzhang • Previous Articles     Next Articles

Analysis on Tunnel Accident on Line 1 of Saint Petersburg Metro

HU Xiangdong1, 2,BAI Nan1, 2,LI Hongbo3   

  1. 1. Department of Geotechnical Engineering, Tongji University2. Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University3. CCCC Second Highway Consultants Co., Ltd.
  • Received:2008-03-31 Revised:2008-07-18 Online:2008-08-20 Published:2009-11-23

Abstract:

“LesnayaMuzhestvo Square” running tunnel on Line 1 of Saint Petersburg Metro went across the ancient river channel of the Neva River. A series of accidents occurred during the construction period and after the tunnel was put into use in 1975. In the late period, lots of water inflow with quicksand came into the tunnel, which resulted in surface settlement, deformation of the tunnel, serious damage of the structure and the close of the tunnel in 1995. After an introduction to the construction method, the course of the accidents and the countermeasures taken, the causes for the accidents are analyzed in the paper.

CLC Number: