Tunnel Construction ›› 2008, Vol. 28 ›› Issue (4): 456-459.DOI: A
• wenzhang • Previous Articles Next Articles
YANG Jiasong
Received:
Revised:
Online:
Published:
Abstract:
Theoretical study and site ventilation tests are made on gallerytype jet construction ventilation technology on basis of Jinping Auxiliary Tunnel (west side) of Jinping hydropower project and conclusion is made on such key technologies as the type selection and layout of gallerytype jet ventilation fans and ventilation management. The calculation formula of the required air flow rate and the number of the fans and the principle of selecting proper values for the relevant parameters are summarized. The construction ventilation technology has been successfully applied in the deadend driving of the 9300mlong twintube tunnel with internal combustion working mode and trackless transportation system, which demonstrates that all the indexes of the air inside the tunnel have met the national environment and health requirements and good economic and social efficiency have been achieved.
CLC Number:
 
U453.5
YANG Jiasong. Study on Gallerytype Jet Construction Ventilation Technology for Superlong Tunnels and Its Application in Works[J]. Tunnel Construction, 2008, 28(4): 456-459.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/A
http://www.suidaojs.com/EN/Y2008/V28/I4/456