Key Technology for Construction of Secondary Lining of Mined Metro Ventilation
Gallery with Double Story, Double Span, Flat Roof and Upright Wall

YANG Weihu 1,2,DU Jiang 1,3, LIU Huanqiang 1,2   

  1. 1. Xi’an Railway Engineering Co., Ltd, Electrification Bureau Group, CREC2. Beijing
    Jiaotong University3. Shijiazhuang Railway Institute
  • Received:2008-01-07 Revised:2008-05-22 Online:2008-08-20 Published:2009-11-23

Abstract:

The construction of mined Metro ventilation gallery with large crosssection, double storey, double span, flat roof and upright wall has such features as relatively large excavation span, complex temporary support system and complex loadshifting of the secondary lining structure. Taking the construction of the doublestorey section of No. 1 ventilation gallery of Shiliuzhuang Road Station on Line 4 of Beijing Metro as example, the authors summarize the key construction technology for the ventilation gallery with large crosssection, double storey, double span, flat roof and upright wall in terms of central drift excavation method, load shifting and sectionbysection construction of the insitu cast concrete lining. The project practice shows that the construction plan is reasonable and feasible.

Key words: doublestorey, doublespan, flat roof, upright wall, miningsecondary castinsitu concrete liningload shift, ventilation gallery of Metro workssupport replacementdemolition