ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2007, Vol. 27 ›› Issue (4): 69-71.DOI: B

• wenzhang • Previous Articles     Next Articles

Construction Quality Control and Accident Treatment for
Bored Castinplace Concrete Piles

YI Jian-Wen   

  1. Chidabai Railway Project Headquarters, China Railway Tunnel
    Stock Co., Ltd.
  • Received:2007-05-18 Online:2007-08-20 Published:2009-12-04

Abstract:

The construction process control methods and accident treatment of bored castinplace concrete piles are presented in the paper and conclusion is drawn that the quality of the bored castinplace concrete piles can be guaranteed if the construction process of the bored piles is well controlled during construction.

CLC Number: