ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2007, Vol. 27 ›› Issue (增刊1): 49-51.DOI: B
• wenzhang • Previous Articles Next Articles
WANG Jun-Chao
Received:
Revised:
Online:
Published:
Abstract:
Taking the working lot of No. 8 inclined shaft of Taihangshan tunnel as case history, the author presents the design and manufacture of the invert trestles and the techniques and key points of the construction of the tunnel invert by means of invert trestles. For the sake of the application of the invert trestles, the problem in the integral invert casting and the interference between the invert construction and the transportation logistics for the excavation faces are successfully resolved. The paper can provide reference for the construction of similar inverts in the future.
CLC Number:
U455
WANG Jun-Chao. Invert Construction Technology by means of Invert Trestles: Case Study on Working Lot of No. 8 Inclined Shaft of Taihangshan Tunnel[J]. Tunnel Construction, 2007, 27(增刊1): 49-51.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2007/V27/I增刊1/49