ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2007, Vol. 27 ›› Issue (增刊1): 55-58.DOI: B

• wenzhang • Previous Articles     Next Articles

Rapid Construction Technology and Management of Steep
Inclined Shaft with Small CrossSection

 MAO Jun   

  1. China Railway Tunnel Group Co., Ltd., Luoyang 471009, Henan, China
  • Received:2007-01-19 Revised:2007-03-19 Online:2007-06-18 Published:2010-01-05

Abstract:

Based on the actual conditions of No. 7 small crosssection steep inclined shaft of  Taihangshan tunnel, this article briefly introduces the key technological points, mechanical equipment matching and construction organization measures adopted to achieve rapid construction of adit in Grade Ⅳ, Grade Ⅴ and Grade Ⅵ strengthened surrounding rock mass and preliminarily establishes a complete set of construction technology and management method for steep inclined shafts in soft ground, which can provide reference for similar works in the future.

Key words: steep inclined shaft with small crosssection  , rapid construction technology  , management

CLC Number: