Taking the shield boring of Nanjing Metro in fine silty sand ground as an example, the author analyzes the main risks in tunnel boring and summarizes the construction countermeasures, particularly in aspect of water inflow, sand inflow, ground surface settlement and building/structure deformation. In the end, the risks have been brought under effective control. The countermeasures presented in the paper, especially those for shield boring under brickmasonry workshops without foundations, can provide reference for similar projects in the future.
Key words: fine silty sand ground  , ground liquefaction  , risk analysis  , settlement control  , countermeasure
CLC Number:
U 458
LI Fa-Yong. Analysis and Countermeasures for Risks in Shield Boring in Fine Silty Sand Ground[J]. Tunnel Construction, 2009, 29(6): 668-673,677.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2009/V29/I6/668
Current Situation and Development of Causes of Secondary Lining Crack in Loess Tunnel and Countermeasures
Surrounding Rock of Haidong Water Conveyance Tunnel of Central Yunnan Water Diversion Project: Risks and Countermeasures
for Using Ordinary Prestressed Anchor Cables
Research on Construction Risks and Countermeasures of Piperoof Undercutting Method in Saturated Soft Soil