Abstract:
Sirenbanao Tunnel is about 4.8km long from Macheng to Wuhan in the ShanghaiChengdu highway. The ventilation system in this tunnel is the difficult key point in the design. The main ventilation schemes are compared in this paper. Based on the appropriate location of the inclined shaft and the vertical shaft, the vertical full jet current ventilation and longitudinal blowin and exhaust ventilation are analyzed to ensure safety and economy during the operation of the tunnel.
Key words: highway tunnel  , ventilation  , longitudinal ventilation
CLC Number:
TU453.5
CHEN Guang-Meng, JU Yong-Yan, DAN Zheng-Xiong. Comparison of Ventilation Schemes for Long Sirenbanao Highway Tunnel[J]. Tunnel Construction, 2007, 27(增刊): 278-283.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2007/V27/I增刊/278