ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2007, Vol. 27 ›› Issue (增刊): 299-301.DOI: B

• wenzhang • Previous Articles     Next Articles

Application of |Hydraulic |Model Experiment on
Yiluo River Extralarge Bridge of Luojie |Highway

 ZHOU Feng   

  1. Luoyang Highway Bridge Construction Group Co., Ltd., Luoyang 471009, Henan
  • Received:2007-05-11 Revised:2007-06-04 Online:2007-08-10 Published:2010-04-20

Abstract:

The hydraulic model experiment on Yiluo river large bridge of Luojie highway is presented in this paper, which can be reference to the design and construction of the bridge.

Key words: hydraulic model experiment  , extralarge bridge design

CLC Number: