ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2007, Vol. 27 ›› Issue (增刊): 465-470.DOI: B
• wenzhang • Previous Articles Next Articles
FU Chun-Jing
Received:
Revised:
Online:
Published:
Abstract:
The station presented in this paper is in the finesand layer, and passes through the heating, water, sewage and gas pipeline, and is in close proximity of some important buildings, therefore, controlling the settlement of ground during the construction of the station become very crucial. The techniques and measures in the construction of the threearch shallow station are discussed. The tunnelcolumn method is used to reduce the settlement and ensure the safety. In addition, the reasons of settlement and its distribution system during the construction of the largescale tunnels in urban areas are analyzed.
Key words: mining method threearch station, tunnelcolumn method advance explore changing support optimization of schemes
CLC Number:
 
U459.3
U456.3+1
FU Chun-Jing. Control Measures for Ground Settlement during Station Construction with TunnelColumn Method[J]. Tunnel Construction, 2007, 27(增刊): 465-470.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2007/V27/I增刊/465