ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2009, Vol. 29 ›› Issue (增刊1): 88-92.DOI: B
• wenzhang • Previous Articles Next Articles
GU Zong-Hua
Received:
Revised:
Online:
Published:
Abstract:
According to the practice of the disc hobbing in a project and in combination with structure design of cutters, rock breaking principle and a lot of on-site maintenance experience of cutters, this thesis, taking the lot of a disc hobbing designed by a foreign company, explains the maintenance process and techniques of the cutter in detail and summarizes some scientific and practical experience in management of disc hobbing in actual construction, which may provide reference to disc cutter management, maintenance and modification in shield and TBM construction afterwards.
Key words: disc hobbing, repair technology, cutters management
CLC Number:
U 455.3+9
GU Zong-Hua. Maintenance and Management of Disc Hobbing[J]. Tunnel Construction, 2009, 29(增刊1): 88-92.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2009/V29/I增刊1/88