| [1] |
WANG Shuangwang, YANG Bin, ZHONG Qingfeng, CHEN Liangwu.
Intelligent Fault Diagnosis of Low-Speed, Heavy-Load, Ultra-Large Rolling Bearings Using a Channel Attention Mechanism and a One-Dimensional Convolutional Neural Network
[J]. Tunnel Construction, 2026, 46(5): 985-993.
|
| [2] |
ZOU Yi, ZHU Bitang, LUO Ruping, OUYANG Hua, WANG Jiahao, LUO Le.
Experimental Study on Mechanical Characteristics of Heterogeneous Grouting in Water-Rich Fault Fracture Zones
[J]. Tunnel Construction, 2026, 46(4): 741-750.
|
| [3] |
ZHAO Xiaoyong, LI Guoliang, WANG Xindong, GAO Xinqiang, XIONG Wei, GUO Xiansuo.
Mechanical Properties of Prefabricated Inverted Arch Structures in Railway Tunnels During Construction
[J]. Tunnel Construction, 2026, 46(4): 828-839.
|
| [4] |
YAO Hongzhi, WANG Han, BAI Dongfeng, SHI Baotong, ZHENG Wankun, ZHANG Caifei, HAN Xingbo.
Comparative Analysis of Construction Excavation Schemes and Support Parameters for Ultra-Large-Span Underground Storage Tank Space
[J]. Tunnel Construction, 2025, 45(S2): 289-301.
|
| [5] |
HUANG Shuhua.
Key Construction Technology and Application Practice
of Mechanized Connecting Passage of a Super-Large Diameter Shield Tunnel in Complex Water-Rich Strata
[J]. Tunnel Construction, 2025, 45(S1): 280-289.
|
| [6] |
ZHANG Hongda, MENG Xianjun, HAN Weifeng, ZHANG Chanjuan, JIANG Yongcheng, ZOU Qiang.
Fault Diagnosis Strategy for Magnetostrictive Sensor
Test Platform Based on Steady State Recognition
[J]. Tunnel Construction, 2025, 45(4): 730-739.
|
| [7] |
NI Jiaze, LI Xiang, ZHANG Jinzhang, HUANG Hongwei.
Structural Safety Risk Analysis of Subsea Tunnels Crossing Fault Zones in Jiaozhou Bay Second Subsea Tunnel
[J]. Tunnel Construction, 2025, 45(12): 2287-2297.
|
| [8] |
TAO Zhigang, LIN Weijun, LI Yong, SUN Yingying, XIONG Yiwen, CHEN Mingliang.
Control Technology of
Negative Poisson′s Ratio Anchor Cable for Large Deformation Tunnel Across Faulted Soft Rocks
[J]. Tunnel Construction, 2024, 44(S1): 113-123.
|
| [9] |
XIAN Guo, ZOU Yongmu, LI Xiaobing, WANG Guan, WANG Yangyang.
Integrated Application and
Some Issues of Modern Tunneling Technology
for Chengdu-Kunming Railway Tunnel
[J]. Tunnel Construction, 2024, 44(8): 1713-1722.
|
| [10] |
TIE Mingliang, CHANG Mingyu, ZHAN Shengwen, SHEN Yusheng, ZUO Leibin, CHEN Kongfu, ZHANG Xi.
Longitudinal Response of
Tunnels Under Nonlinear Fault Displacement Based
on Foundation Beam Theory
[J]. Tunnel Construction, 2024, 44(7): 1365-1376.
|
| [11] |
TAO Zhigang, SUN Jihao, CAO Zhensheng, HU Cai, GUO Longji, HE Manchao.
Mechanism of Double-Gradient Grouting for Large Deformation Control of Surrounding Rock in Tunnels Crossing Fault Fracture
Zones
[J]. Tunnel Construction, 2024, 44(6): 1194-1213.
|
| [12] |
LI Linfeng, TAN Zhongsheng, ZHOU Zhenliang, PENG Wenbo.
Support Effect of Steel Tubes of Open Tunnel Boring
Machine in Tianshan Shengli Tunnel
[J]. Tunnel Construction, 2024, 44(5): 984-990.
|
| [13] |
LIU Hongzhi, CAO Yinggui, DAI Zhenyang, SUN Shuliang.
Selection and Targeted Design of CrossSea
Ultralarge Diameter Slurry Shield Tunneling Through
Various Typical Strata: A Case Study of Jiaozhou Bay
Second Submarine Tunnel in Qingdao, China
[J]. Tunnel Construction, 2024, 44(4): 793-800.
|
| [14] |
ZHANG Jilu, LIU Xinrong, ZHOU Xiaohan, QI Zhanfeng, LIU Hanzhi, LIU Yuyu, SUN Hao, WU Tao.
Formation Mechanism and Releasing Risk Assessment of
Hazardous Gas in Tunnel Surrounding Rocks in Western Sichuan and
Eastern Xizang, China
[J]. Tunnel Construction, 2024, 44(2): 296-307.
|
| [15] |
DAI Zhiren, HU Ruiqing, WANG Zeyu, ZHAO Qichao.
Mechanism and Treatment Measures of Water and Sand
Inrush in
Operational Tunnel in Karst Area
[J]. Tunnel Construction, 2023, 43(S2): 369-377.
|