Tunnel Construction ›› 2010, Vol. 30 ›› Issue (S1): 360-364.

• wenzhang • Previous Articles     Next Articles

Assessment on Construction Risks of Subsea Tunnels Crossing Fault
 and Fracture Zones and Countermeasures

ZHOU  Shu-Meng, BO  Guo-Dong, LUO  Xiao-Beng   

  1. China Railway Tunnel Survey & Design Institute, Co., Ltd., Tianjin, 300133
  • Revised:2010-05-17 Online:2010-08-14 Published:2010-08-25

Abstract:

Jiaozhou Bay subsea tunnel in Qingdao crosses several fault and fracture zones. Therefore, collapses, cavein, water gushing and mud gushing are subject to occur during the tunnel construction. The risks related to tunneling through fault and fracture zones are analyzed on basis of the design and construction of the tunnel. Furthermore, countermeasures are recommended for the risks. The paper can be served as reference for similar works in the future.

Key words: Jiaozhou Bay subsea tunnel, fault and fracture zone, risk analysis, risk assessment, risk control