| [1] |
HUANG Shuhua.
Key Construction Technology and Application Practice
of Mechanized Connecting Passage of a Super-Large Diameter Shield Tunnel in Complex Water-Rich Strata
[J]. Tunnel Construction, 2025, 45(S1): 280-289.
|
| [2] |
LIU Xiaolin.
Displacement Measurement Method Integrating Improved Oriented FAST and Rotated BRIEF Feature Points With Lucas-Kanade Pyramid Optical Flow and Its Engineering Application
[J]. Tunnel Construction, 2025, 45(8): 1459-1468.
|
| [3] |
LOU Kaifeng, PENG Dingmao, BAO Xiaoming, ZHENG Ru, HAO Xiaohan.
Refined Exploration of Geological Conditions for Shield Tunneling Under Seabed in Complex Marine Environments: A Case Study of Jintang Subsea Tunnel Project on Ningbo-Zhoushan Expressway Second Line
[J]. Tunnel Construction, 2025, 45(7): 1336-1344.
|
| [4] |
LI Ming, WANG Lei, CUI Hao, CHEN Honglei, SUN Changsong, YANG Zhe.
Interface Temperature Field of Freezing Method Construction for a Super-Large Diameter Shield Tunnel Connecting Channel: A Case Study of Beijing East Sixth Ring Renovation
Project
[J]. Tunnel Construction, 2025, 45(2): 352-360.
|
| [5] |
SUN Zhenchuan, LYU Qianqian, SUN Feixiang, YANG Zhenxing.
Surrounding Rock Load and Segment Mechanical Behavior of Chunfeng Road Super-Large Diameter Shield Tunnel
[J]. Tunnel Construction, 2024, 44(S2): 84-92.
|
| [6] |
QI Chun, YU Yu, PANG Tao, LIU Jinsong, TIAN Siming, WANG Chuang, LUO Lusen.
General Design Scheme For
Shu′an Tunnel of Chengdu-Chongqing Midline Railway
[J]. Tunnel Construction, 2024, 44(S2): 391-398.
|
| [7] |
SONG Xiangshuai, HE Yuan, HAN Xiaoming, XU Chao.
Study on InSitu Solidification of LakePhase Silt in an Island Cofferdam
Construction for Launching a 16m Shield
[J]. Tunnel Construction, 2024, 44(2): 288-295.
|
| [8] |
CHEN Jiandang, CHEN Liqiang, XU Shunming, WANG Xiaofei.
Construction Technology of Shield Translation
Launching Under Limited
Site Conditions
[J]. Tunnel Construction, 2023, 43(S2): 485-491.
|
| [9] |
CHENG Yangyang, LUO Bin, ZHANG Beizhi.
Research on Prefabrication Technology of Major
Diameter Concrete Segment
[J]. Tunnel Construction, 2023, 43(S1): 487-492.
|
| [10] |
CHEN Shaolin, HUANG Xinmiao, YANG Jie, XIAO Zhonglin.
Key Technology for TwoWay Separate Launching of Four
LargeDiameter Earth Pressure Balance Shields in Coastal Shafts: a Case
Study of Binhaixincheng
StationAirport
Station Section of Binhai Express Line in Fuzhou, China
[J]. Tunnel Construction, 2022, 42(S2): 449-457.
|
| [11] |
Construction Technology of Integral Translation and UTurn of Large Diameter Shield.
Construction Technology of Integral Translation and UTurn
of Large Diameter Shield in
Narrow Space: a Case Study of Kanaphuli Tunnel in Bangladesh
[J]. Tunnel Construction, 2022, 42(S1): 459-465.
|
| [12] |
YOU Yongfeng, LIANG Kuisheng, DU Chuangdong, CHEN Zhengming.
Launching Technology with Shallow Overburden for SuperLarge Diameter Shield in Chunfeng Tunnel
[J]. Tunnel Construction, 2021, 41(S1): 382-.
|
| [13] |
GUO Zhi, TANG Xigang, HAN Lisen, TIAN Bin, DING Shaojun, LU Xiaofeng.
Study and Practice on Negative Ring Launching
Technique for
DoubleShield TBM Used in Qingdao Metro
[J]. Tunnel Construction, 2021, 41(S1): 425-.
|
| [14] |
GUO Zhi, QU Qiufen, FAN Zhiguo, LIU Guitao, LU Xiaofeng, GONG Yinglei.
Construction Technology Innovation of Double-Shield
Tunnel Boring -Machine in Qingdao Metro Line 1
[J]. Tunnel Construction, 2021, 41(8): 1385-.
|
| [15] |
LI Aimin, LI Hong′an, LI Bin.
A Design Scheme for Lateral Launching of a Double Track
Shield Tunnel
Using a Mined Single Channel with a Composite Structure
[J]. Tunnel Construction, 2021, 41(7): 1188-1196.
|