Using slurry TBM to excavate rock tunnels is not a common practice in Taiwan. An actual tunnel project excavated by using slurry TBM is introduced in this paper. The TBM selection considerations, machine characteristics, construction risks and treatments of the project are described in detail. Although risk may still occur, these experiences show that the severe wearing of the disc cutter, the blocking of the slurry discharge pipe and the sustained convergence of rock mass and C/W ratio are to blame for the slow progress of TBM construction. This construction practice can provide reference for the rock tunnel excavated by TBM in future.
Key words: slurry TBM, rock tunnel, slow progress
QIU Lin-Bin, XIAO Fu-Yuan, SHU Qi-Wen, JU Han-Gui, LIU Dun-Jie. Case Study of Rock Tunnel Excavated by Slurry Type TBM[J]. Tunnel Construction, 2010, 30(S1): 476-480.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/
http://www.suidaojs.com/EN/Y2010/V30/IS1/476
Applicability of Uneven Convergence Mode in Soft Rock Tunnels
Design Practice of Prestressed Anchor Cable Support Technology for Soft Rock with Extremely High Geostress and Large Deformation in Muzhailing Tunnel
Stress Release Effect of Soft Rock Tunnel with High Ground Stress Based on Mechanical Vibration Method
Surrounding Rock of Haidong Water Conveyance Tunnel of Central Yunnan Water Diversion Project: Risks and Countermeasures
for Using Ordinary Prestressed Anchor Cables
Analysis of Typical Failure Characteristics and Corresponding Monitoring Measures of Tunnel Lining Structure
During Service Period Based on Strength Reduction Method
Numerical Modeling and Parametric Optimization of ThreeBench Construction Method for Zhengpantai Deep Tunnel in WaterRich Rocks