ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Control of Installation Accuracy of Steel End Shells in Construction of Immersed Tunnels

Expand
  • (1. China Railway Tunnel Stock Co., Ltd., Zhengzhou 450003, China; 2. School of Civil Engineering, Liaocheng University, Liaocheng 252059, Shandong, China)

Received date: 2010-11-21

  Revised date: 2011-01-13

  Online published: 2012-03-09

Abstract

The lessons and experience learned in the installation of the steel end shells of ShengwudaoDaxuecheng immersed tunnel in Guangzhou are summarized. It is concluded that the installation of large steel members with the millimeter level accuracy can be realized by means of accurate measurement, correct welding and installation technology and enough monitoring.

Cite this article

LIU Kai, CHEN Xia . Control of Installation Accuracy of Steel End Shells in Construction of Immersed Tunnels[J]. Tunnel Construction, 2012 , 32(1) : 99 -102 . DOI: 10.3973/j.issn.1672-741X.2012.01.017

Outlines

/

〈 〉