Effective Vibrationminimizing Blasting Technology: Case Study on  Changhongling Tunnel Crossing underneath Jiangchi Town

Expand
  • (China Railway Tunne Group Co., Ltd., Luoyang 471009, Henan, China)

Received date: 2012-04-26

  Revised date: 2012-05-02

  Online published: 2012-07-09

Abstract

Changhongling tunnel on ChongqingLichuan railway crosses underneath Jiangchi town. In the construction of the towncrossing section of the tunnel, vibrationminimizing blasting tests are performed by using electronic detonators. The mentioned tests are carried out under the guidance of interference vibrationminimizing theory. The vibrationminimizing blasting is monitored, and the blasting parameters are optimized. Fullface vibrationminimizing blasting technology with electronic detonators, which achieves less than 1.0cm/s blasting vibration velocity under the condition of about 30m distance, is established. In the end, the blasting vibration velocity is reduced, the safety of the surface buildings is guaranteed, the primary support of the tunnel is reduced and the construction efficiency is improved.

Cite this article

RUAN Qinglin . Effective Vibrationminimizing Blasting Technology: Case Study on  Changhongling Tunnel Crossing underneath Jiangchi Town[J]. Tunnel Construction, 2012 , 32(3) : 281 -286 . DOI: 10.3973/j.issn.1672-741X.2012.03.004

Outlines

/

〈 〉