Safety Risk Assessment of Yemaliang Extralong Tunnel in Design Phase

Expand
  • (Communication Planning and Design Institute of Shanxi Province, Taiyuan 030012, China)

Received date: 2011-12-22

  Revised date: 2012-06-20

  Online published: 2012-10-16

Abstract

Safety risk assessment should be carried out for extralong tunnels and tunnels under complex geological conditions. The safety risks of Yemaliang tunnel are analyzed and assessed by means of combination of qualitative analysis and quantitative analysis, based on expert investigating process and analytic hierarchy process. The study shows that: 1) The safety risk grade of Yemaliang tunnel is Grade Ⅲ. 2) There is no invincible risk. 3) It is proposed that dynamic risk assessment should be made and risk management should be strengthened so as to achieve the goal of safety, economic benefit, environment protection and high quality.

Cite this article

LIU Jianhai . Safety Risk Assessment of Yemaliang Extralong Tunnel in Design Phase[J]. Tunnel Construction, 2012 , 32(4) : 518 -522 . DOI: 10.3973/j.issn.1672-741X.2012.04.016

Outlines

/

〈 〉