Analysis and Control of Risks in Tunneling in Sandy Cobble  Strata by Mining Method: Case Study on XidanLingjing Bystreet Section of Beijing Metro

Expand
  • (The 2nd Engineering Branch of Beijing Municipal Construction Group Co., Ltd., Beijing 100041, China)

Received date: 2012-01-30

  Revised date: 2012-05-23

  Online published: 2012-10-16

Abstract

XidanLingjing Bystreet section of Beijing Metro, which is constructed by mining method, crosses underneath overpasses, roads, utility lines and air defense works. The risks in the construction of the tunnel are identified, analyzed, assessed and coped with. The pile foundations of the overpass are underpinned and the ground around the pile foundations is reinforced by grouting. The spacing of the lattice girders, the advance small duct and the connection plate of the lattice girders are optimized and foot locking bolts are added. The deserted slope protection piles and air defense works that interfere into the tunnel are broken and consolidated. In the end, the risks have been brought under effective control and the tunnel has been completed successfully.

Cite this article

ZHANG Yongjun . Analysis and Control of Risks in Tunneling in Sandy Cobble  Strata by Mining Method: Case Study on XidanLingjing Bystreet Section of Beijing Metro[J]. Tunnel Construction, 2012 , 32(4) : 544 -551 . DOI: 10.3973/j.issn.1672-741X.2012.04.020

Outlines

/

〈 〉