Analysis on the Construction Methods for Loess Tunnel with Large Crosssection

  • SHI Lei ,
  • HOU Xiaojun ,
  • WU Jinguang
Expand
  • (1. China Railway Seven Engineering Group Co., Ltd., Zhengzhou 450016, China; 2. China Railway First Engineering Group Co., Ltd., Xi’an 710000, China)

Received date: 2012-09-28

  Revised date: 2012-10-26

  Online published: 2013-02-19

Abstract

Tunnel construction monitoring on sit is was carried out by means of high precision total station and reflective film, with the monitoring of Dunliang tunnel as an example. The advantages, disadvantages and applicability of the double side drift method, single side drift method and threebench excavation method for loess tunnel with large crosssection are put into comparison, on basis of monitoring data analysis. Key deformation control technologies of different construction methods are obtained. The paper can provide references for similar projects in the future.

Cite this article

SHI Lei , HOU Xiaojun , WU Jinguang . Analysis on the Construction Methods for Loess Tunnel with Large Crosssection[J]. Tunnel Construction, 2012 , 32(增刊1) : 8 -13 . DOI: 10.3973/j.issn.1672-741X.2012.z1.002