ISSN 2096-4498

   CN 44-1745/U

二维码

Construction Technologies of Waterstopping Ties in Tunnel Lining

  • JI Xiafang ,
  • CHANG Bao
Expand
  • Manager Department of LanzhouChongqing Project, China Railway First Bureau, Guang’an 638003, Sichuan, China)

Received date: 2012-07-30

  Revised date: 2012-09-20

  Online published: 2013-02-19

Abstract

The application range and characteristics of rubber waterstopping tie are presented. Construction sequence and installation requirements of radial and longitudinal waterstopping ties are presented. The connection and installation of stopping ties are solved by using steel Ushape block and wood block frame to fasten waterstopping ties and adopting rational connection mode. The paper can provide references for waterstopping tie construction of similar projects in the future.

Cite this article

JI Xiafang , CHANG Bao . Construction Technologies of Waterstopping Ties in Tunnel Lining[J]. Tunnel Construction, 2012 , 32(增刊1) : 109 -112 . DOI: 10.3973/j.issn.1672-741X.2012.z1.024

Outlines

/

〈 〉