Construction Technologies for Shallowburied Section of Shilin Tunnel Constructed by Cutandcover Method Located in Soft Subsoil

  • ZHANG Dangping
Expand
  • (The Fifth Engineering Co., Ltd. of China Railway First Group, Baoji 721006, Shaanxi, China)

Received date: 2012-06-19

  Revised date: 2012-10-26

  Online published: 2013-02-19

Abstract

Cutandcover method, long pipe roof and protection arch subsoil reinforcement technology are used in shallowburied section of Shilin tunnel located in soft subsoil, so as to reduce the construction difficulty and risk and to realize rapid and safe construction. The cutandcover method is simple and with less cost. The paper can provide references for similar projects in the future.

Cite this article

ZHANG Dangping . Construction Technologies for Shallowburied Section of Shilin Tunnel Constructed by Cutandcover Method Located in Soft Subsoil[J]. Tunnel Construction, 2012 , 32(增刊1) : 117 -121 . DOI: 10.3973/j.issn.1672-741X.2012.z1.026