Study on Standardized Matching of Green Construction Facilities of Shallowburied Mined Tunnel Section
Received date: 2012-07-26
Revised date: 2012-09-10
Online published: 2013-02-19
The study on combination green and environmentprotection facilities is the main point of standardized matching of green construction facilities of shallowburied mined tunnels. The purposes are mining construction risk control, construction environment improvement and informationaided construction. The mucking, transportation, ventilation and emergency communication of the facilities are studied.
ZHANG Shaokuan , LIU Zhihua , SONG Long . Study on Standardized Matching of Green Construction Facilities of Shallowburied Mined Tunnel Section[J]. Tunnel Construction, 2012 , 32(增刊2) : 13 -17 . DOI: 10.3973/j.issn.1672-741X.2012.z2.003
/
| 〈 |
|
〉 |