ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
New Construction Technologies for Shieldbored Tunnel of Beijing Metro Line 10 Crossing underneath Existing Buildings
Received date: 2012-07-31
Revised date: 2012-09-12
Online published: 2013-02-19
Shieldbored tunnel in urban areas sometimes has to cross underneath existing buildings and underground pipelines.Technologies, including shield machine modification,soil improvement,tunneling parameter control,using newtype of backfilling materials and treatments after construction are used in the tunneling of Lovat L251 shield machine of Beijing Metro line 10. Successful underneath crossing buildings are guaranteed.The paper can provide references for similar projects in the future.
XU Chaohui . New Construction Technologies for Shieldbored Tunnel of Beijing Metro Line 10 Crossing underneath Existing Buildings[J]. Tunnel Construction, 2012 , 32(增刊2) : 83 -87 . DOI: 10.3973/j.issn.1672-741X.2012.z2.016
/
| 〈 |
|
〉 |