ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Study on Air Quality Control Measures for Metro Tunnel Constructed by ShallowBuried Mining Method
Received date: 2012-07-26
Revised date: 2012-09-17
Online published: 2013-02-19
In order to decrease dust and exhaust contents in air, improve construction condition and reduce causes of occupational disease in tunnels constructed by shallowburied mining method, a suitable arrangement scheme of electric driven transportation equipment, dust collector and new type concrete spraying machine is introduced in this paper. And the aims of controlling dust and harmful gas contents in tunnel and improving construction condition of mined tunnel are achieved by this scheme.
ZHANG Shaokuan , LIU Zhihua . Study on Air Quality Control Measures for Metro Tunnel Constructed by ShallowBuried Mining Method[J]. Tunnel Construction, 2012 , 32(增刊2) : 133 -135 . DOI: 10.3973/j.issn.1672-741X.2012.z2.026
/
| 〈 |
|
〉 |