3D Numerical Analysis on Construction Influence of Smallspaced Overlapping Shieldbored Tunnels
Received date: 2012-01-10
Revised date: 2012-08-29
Online published: 2013-02-19
The overlapping shield bored section of Honglingzhong road stationLaojie stationShaibu road station section on Shenzhen Metro line 3 is 1 045 m.The Calculation simulation analysis is made on surrounding rock, supporting structure and excavation course of overlapped shield bored tunnel, by menas of ANSYS 3D finite element analysis software.The construction program of “construct down tunnel first and then the upper one” is reliable. The paper can provide references for similar projects in the future.
Key words: Metro; overlapping tunnel; small spacing tunnel; 3D finite element