Safety Guarantee Measures for Intermediate Floor Slab of Metro Station when TBM Passing

  • TIAN Haowen
Expand
  • (Technology Center of China Railway Tunnel Group, Luoyang 471009, Henan, China)

Received date: 2012-11-02

  Revised date: 2012-12-05

  Online published: 2013-03-05

Abstract

When TBM passes along the intermediate floor slab of Dalongshan station of Chongqing Metro, deformation, instability or failure may occur to the intermediate floor slab. As a result, countermeasures, including strengthening the structure of the intermediate floor slab, reinforcing the intermediate floor slab by temporary supports, controlling the quality of the arcshaped cradle and strengthening the informationaided operation, are taken. In the end, the TBM passes along the intermediate floor slab successfully, inducing neither serious deformation nor damage to the station structure, which demonstrates that the TBM transferring program adopted is reasonable.

Cite this article

TIAN Haowen . Safety Guarantee Measures for Intermediate Floor Slab of Metro Station when TBM Passing[J]. Tunnel Construction, 2013 , 33(2) : 129 -134 . DOI: 10.3973/j.issn.1672-741X.2013.02.007

Outlines

/

〈 〉