Construction Technology for Fork Section of Yingpanlu Xiangjiang River Crossing Tunnel in Changsha, China

  • JING Yongjun ,
  • FAN Zhi ,
  • OUYANG Gangjie ,
  • CHEN Changqiang ,
  • XU Yumin
Expand
  • (China Railway Tunnel Stock Co., Ltd., Zhengzhou 450000, Henan, China)

Received date: 2012-12-08

  Revised date: 2013-01-28

  Online published: 2013-03-23

Abstract

The junction section of Yingpanlu Xiangjiang river crossing tunnel has changing large crosssection, shallow overburden, poor geological conditions and complex stressing conditions. The technologies used for the construction of the fork section of the tunnel, especially the excavation sequence and the secondary lining of the tunnel section with changing large crosssection, are presented in the paper. The practice demonstrates that the technologies adopted are feasible for the specific conditions of the works. 

Cite this article

JING Yongjun , FAN Zhi , OUYANG Gangjie , CHEN Changqiang , XU Yumin . Construction Technology for Fork Section of Yingpanlu Xiangjiang River Crossing Tunnel in Changsha, China[J]. Tunnel Construction, 2013 , 33(3) : 231 -236 . DOI: 10.3973/j.issn.1672-741X.2013.03.011

Outlines

/

〈 〉