Abstract

The three major development phases witnessed by immersed highway tunnels are summarized, the key technological issues of immersed highway tunnels, such as the longitudinal profile, structural crosssection, foundation and tube element joints of immersed highway tunnels, are analyzed, and the critical issues and solutions for Hong KongZhuhaiMacao immersed tunnel are presented.

Cite this article

ZHANG Zhigang , LIU Hongzhou . Development and Key Technologies of Immersed Highway Tunnels[J]. Tunnel Construction, 2013 , 33(5) : 343 -347 . DOI: 10.3973/j.issn.1672-741X.2013.05.002