ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Received date: 2012-05-11
Revised date: 2012-08-02
Online published: 2013-05-16
The three major development phases witnessed by immersed highway tunnels are summarized, the key technological issues of immersed highway tunnels, such as the longitudinal profile, structural crosssection, foundation and tube element joints of immersed highway tunnels, are analyzed, and the critical issues and solutions for Hong KongZhuhaiMacao immersed tunnel are presented.
ZHANG Zhigang , LIU Hongzhou . Development and Key Technologies of Immersed Highway Tunnels[J]. Tunnel Construction, 2013 , 33(5) : 343 -347 . DOI: 10.3973/j.issn.1672-741X.2013.05.002
/
| 〈 |
|
〉 |