ISSN 2096-4498

   CN 44-1745/U

二维码

Construction Monitoring and Numerical Simulation Analysis of the First Metro Entrance/exit Tunnel Constructed by Rectangular Pipe Jacking Method in Wuhan

  • CHEN Cong ,
  • ZHENG Xinding ,
  • CHEN Yangxun ,
  • WANG Chao ,
  • ZHONG Shihua ,
  • HE Bin
Expand
  • (1 Wuhan Metro Group Co, Ltd, Wuhan 430030, Hubei, China; 2 China Railway Tunnel Survey & Design Institute Co, Ltd, Tianjin 300133, China; 3 China Railway No 5 Bureau Group Co, Ltd, Changsha 410117, Hunan, China)

Received date: 2013-01-31

  Revised date: 2013-03-26

  Online published: 2013-05-16

Abstract

No 4 entrance/exit tunnel of Wangjiadun East station on Line 2 of Wuhan Metro is the first tunnel in Wuhan that has been built by rectangular pipe jacking method The authors analyze the influence on the surrounding environment and the ground displacement laws imposed by tunneling by rectangular pipe jacking method by means of field monitoring and threedimensional numerical simulation, with the construction of No 4 entrance/exit tunnel of Wangjiadun East station as an example. Conclusions drawn are as follows: 1) The final ground surface settlement is proportional to the excavation timing of the corresponding crosssection; 2) Ground surface heaving occurs in front of the face of the pipe jacking machine, while ground surface settlement occurs behind the face of the pipe jacking machine; 3) The ground surface settlement decreases as the distance from the rectangular pipe jacking axis increases, and the range of the influence is about 3 times of the tunnel diameter

Cite this article

CHEN Cong , ZHENG Xinding , CHEN Yangxun , WANG Chao , ZHONG Shihua , HE Bin . Construction Monitoring and Numerical Simulation Analysis of the First Metro Entrance/exit Tunnel Constructed by Rectangular Pipe Jacking Method in Wuhan[J]. Tunnel Construction, 2013 , 33(5) : 354 -361 . DOI: 103973/jissn1672-741X201305004

Outlines

/

〈 〉