Analysis on Influence on Existing Zhongliangshan Tunnel on XiangyangChongqing Railway Imposed by Construction of Abovecrossing New Zhongliangshan Tunnel on ChengduChongqing Passengerdedicated Railway
Received date: 2013-03-15
Revised date: 2013-04-17
Online published: 2013-05-16
New Zhongliangshan tunnel on ChengduChongqing passengerdedicated railway crosses above existing Zhongliangshan tunnel on XiangyangChongqing railway, with the minimum vertical distance between the two tunnels being only 2.9 m. Numerical simulation and field tests are made so as to ensure the safety of the new tunnel and the existing tunnel. The study shows that the existing tunnel has an upward movement trend after the excavation of the abovecrossing tunnel; the maximum vertical displacement occurs at the tunnel crown, reaching 7.10 mm; the maximum horizontal displacement occurs at the spring line, reaching 1.73 mm; the maximum tensile stress appears at the inner side of the spring line; the maximum compressive stress appears at the inner side of the tunnel crown. Reinforcement measures for the existing tunnel is proposed and crown displacement monitoring points and horizontal convergence measuring lines are laid out according to the calculation results. The vertical displacement measured is close to the calculation value; the horizontal displacement measured is slightly less than the calculation value, but the regularity of the two values tends to be consistent. It proves that the research method is feasible and rational.
LIU Zhiqiang , WANG Bin , XING Xiaofei . Analysis on Influence on Existing Zhongliangshan Tunnel on XiangyangChongqing Railway Imposed by Construction of Abovecrossing New Zhongliangshan Tunnel on ChengduChongqing Passengerdedicated Railway[J]. Tunnel Construction, 2013 , 33(5) : 373 -377 . DOI: 10.3973/j.issn.1672-741X.2013.05.007
/
| 〈 |
|
〉 |