ISSN 2096-4498

   CN 44-1745/U

二维码

Key Technologies for Design and Construction of Shallowcovered Forkedsection of Jiaozhou Bay Tunnel

  • LIU Peng
Expand
  • (China Railway Tunnel Survey & Design Institute Co.,Ltd.,Tianjin 300133, China)

Received date: 2013-03-12

  Revised date: 2013-05-01

  Online published: 2013-07-25

Abstract

A forked section is arranged in Jiaozhou Bay tunnel. Due to the shallow cover, poor geological conditions and complex ground surface environment of the forkedsection of the tunnel, there are great difficulties in the design and construction of the forkedsection. The range of the smallspaced tunnel section is determined by means of engineering analogy and numerical simulation. Concrete filling and tie bolts are adopted to reinforce the rock pillar of the smallspaced tunnel section. Pregrouting, primary support strengthening and bench excavating method are adopted for the large crosssection tunnel section. Microvibration blasting technology is adopted during the construction. In the end, rapid construction is achieved for the forkedsection. The monitoring results show that the support parameters, construction technologies and construction program adopted are rational and reliable.

Cite this article

LIU Peng . Key Technologies for Design and Construction of Shallowcovered Forkedsection of Jiaozhou Bay Tunnel[J]. Tunnel Construction, 2013 , 33(6) : 474 -480 . DOI: 10.3973/j.issn.1672-741X.2013.06.009

Outlines

/

〈 〉