ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Analysis on Influence of Shield Tunneling Crossing Underneath Existing Trunk Canal of SouthtoNorth Water Transfer Project
Received date: 2013-03-08
Revised date: 2013-05-13
Online published: 2013-07-17
The shieldbored tunnel from Xiangyanglu Station to Nansihuan Station of line 2 of Zhengzhou Metro crosses underneath the trunk canal of Southtonorth Water Transfer Project. The shield tunneling crossing underneath the trunk canal is simulated by means of Midas/GTS finite element program. Conclusions drawn are as follows: 1) If the spacing between the left Metro tunnel tube and the right Metro tunnel tube is more than 2d (d=tunnel diameter), the overlapping influence of the construction of the twin tunnel tubes on the trunk canal can be effectively reduced; 2) When there is no water in the trunk canal, the settlement requirements can be met when the overburden of the tunnel is 8 m; When there is water in the trunk canal, the overburden of the tunnel is proposed to be 12 m.
YANG Xi , ZOU Qi , WANG Qing . Analysis on Influence of Shield Tunneling Crossing Underneath Existing Trunk Canal of SouthtoNorth Water Transfer Project[J]. Tunnel Construction, 2013 , 33(7) : 562 -566 . DOI: 10.3973/j.issn.1672-741X.2013.07.006
/
| 〈 |
|
〉 |