ISSN 2096-4498

   CN 44-1745/U

二维码

An Analysis on Causes for Cracks on the Inner Surface of Segments  of Tunnel Bored by Double Shield Tunnel Boring Machine

  • SANG Wencai
Expand
  • (Shanxi Wanjiazhai Yellow River Diversion Project Company, Taiyuan 030012, Shanxi, China)

Received date: 2013-03-04

  Revised date: 2013-07-23

  Online published: 2013-09-18

Abstract

During the construction of a tunnel bored by a double shield tunnel boring machine (TBM), many long cracks were found on the inner surface of the side segments. The positions, quantities and widths of the cracks are summarized after field investigations, and the causes for the cracks are analyzed in terms of TBM operation, rock mass conditions, ground water conditions, segment structures and backfilling grouting conditions. It is concluded that the pulling of the thrust cylinders and the constraint of the steel shell of the shield tail are the main causes for the cracks on the inner surface of the segments. Finally, countermeasures to minimize the cracks are proposed.

Cite this article

SANG Wencai . An Analysis on Causes for Cracks on the Inner Surface of Segments  of Tunnel Bored by Double Shield Tunnel Boring Machine[J]. Tunnel Construction, 2013 , 33(9) : 741 -745 . DOI: 10.3973/j.issn.1672-741X.2013.09.007

Outlines

/

〈 〉