A Discussion on the Tunnel Transportation and Construction Methods  for the Taiwan Straitcrossing Tunnel

  • ZHANG Keqiang ,
  • ZHAO Ali ,
  • YANG Hao
Expand
  • (1. Shaanxi Provincial Department of Water Resources, Xi’an 710000, Shaanxi, China;  2. Shaanxi Provincial Department of HangjiangWeihe Transfer Project, Xi’an 710004, Shaanxi, China)

Received date: 2013-05-23

  Revised date: 2013-07-28

  Online published: 2013-10-24

Abstract

The possibility of using electric vehicles and the layout of the Taiwan straitcrossing tunnel are discussed. Some key controlling factors, including ventilation, transportation, equipment reliability and construction schedule of the TBM tunneling are analyzed. The conclusion is that an artificial island is necessary, considering the reliability of technologies and the necessary control over the construction schedule. Finally, a proposal on the function and structure of the artificial island is presented, as well as suggestions for further study.

Cite this article

ZHANG Keqiang , ZHAO Ali , YANG Hao . A Discussion on the Tunnel Transportation and Construction Methods  for the Taiwan Straitcrossing Tunnel[J]. Tunnel Construction, 2013 , 33(10) : 815 -819 . DOI: 10.3973/j.issn.1672-741X.2013.10.003