ISSN 2096-4498

   CN 44-1745/U

二维码

Separate Launching of Shield to Bore underneath Sensitive Buildings in Winter:Case Study on Shield Launching for Guloudajie StationShichahai Station Section on Line 8 of Beijing Metro

  • WANG Gang
Expand
  • (Tunnel Engineering Co., Ltd., China Railway 14th Bureau Group, Jinan 250002, Shandong, China)

Received date: 2013-09-05

  Revised date: 2013-11-28

  Online published: 2013-12-27

Abstract

There are many difficulties in the shield launching for Metro tunnels in urban areas, such as difficulties related to limited site area, cold weather and sensitive buildings. During the launching of the shield for Guloudajie StationShichahai Station section on Line 8 of Beijing Metro, countermeasures, including separate shield launching, cutterhead opening ratio optimization, heat preservation, boring parameter control and accurate management, are taken. Due to the countermeasures mentioned above, successful shield launching has been achieved, the settlement of the sensitive buildings has been brought under effective control and the safety of the sensitive buildings has been guaranteed.

Cite this article

WANG Gang . Separate Launching of Shield to Bore underneath Sensitive Buildings in Winter:Case Study on Shield Launching for Guloudajie StationShichahai Station Section on Line 8 of Beijing Metro[J]. Tunnel Construction, 2013 , 33(12) : 1041 -1047 . DOI: 10.3973/j.issn.1672-741X.2013.12.011

Outlines

/

〈 〉