Consolidation of Intermediate Slab of Metro Station to Ensure Successful  Construction of Stacked Tunnel: Case Study on Nanluoguxiang Station of Line 8 of Beijing Metro

  • WANG Gang
Expand
  • (Tunnel Engineering Co., Ltd., China Railway 14th Bureau Group, Jinan 250002, Shandong, China)

Received date: 2013-09-05

  Revised date: 2013-11-20

  Online published: 2013-12-27

Abstract

Nanluoguxiang Station of Line 8 of Beijing Metro is the first Metro station in Beijing from which two shield machines of the stacked tunnel tubes will launch. It is of great importance to minimize the influence of the launching of the upper shield on the intermediate slab of the Metro station and to ensure the normal horizontal material transportation for the boring of the lower shield. In the paper, it is proposed that vertical steel supports be adopted to replace the shaped steel supports so as to consolidate the intermediate slab of the Metro station. Stress verification is made for the proposed consolidation method, which proves that the proposed method is feasible. The intermediate slab is consolidated according to the proposed method and good result has been achieved. 

Cite this article

WANG Gang . Consolidation of Intermediate Slab of Metro Station to Ensure Successful  Construction of Stacked Tunnel: Case Study on Nanluoguxiang Station of Line 8 of Beijing Metro[J]. Tunnel Construction, 2013 , 33(12) : 1059 -1063 . DOI: 10.3973/j.issn.1672-741X.2013.12.014