Analysis on Transposition of Line 3 and Line 5 of Suzhou Urban Rail Transit in the Industrial Park

  • XI Jun ,
  • SUN Yuanguang
Expand
  • (1. Suzhou Rail Transit Group Limited Company, Suzhou 215004, Jiangsu, China; 2. Guangzhou Metro Design & Research Institute Co., Ltd., Guangzhou 510010, Guangdong, China)

Received date: 2013-07-13

  Revised date: 2013-11-20

  Online published: 2014-01-21

Abstract

By reviewing the process of the planning of Suzhou urban rail transit network, qualitative and quantitative analyses are made on the 2020 planning network. After local optimization of line 3 and line 7 and by transposing line 3 and line 5 in the Industrial Park, a new plan of line 3 and line 5 is proposed. The analysis on the project implementation and the comparison of the passenger flow tests indicate that the new plan has better network function. The new line 3 combined with line 8 can act as a loop line.

Cite this article

XI Jun , SUN Yuanguang . Analysis on Transposition of Line 3 and Line 5 of Suzhou Urban Rail Transit in the Industrial Park[J]. Tunnel Construction, 2014 , 34(1) : 48 -52 . DOI: 10.3973/j.issn.1672-741X.2014.01.008

Outlines

/

〈 〉