ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Key Technologies Applied in Design and Construction of Artificial Islands and Immersed Tunnel of Hong KongZhuhaiMacau Bridge (HZMB) Project
Received date: 2013-12-20
Online published: 2014-01-21
Hong KongZhuhaiMacao Bridge is a large scale seacrossing project connecting Hong Kong, Zhuhai and Macao. In the paper, the following contents are presented: 1) The design of the artificial island and the fabrication, transportation and sinking of steel cylinders; 2) Key technologies applied in the design and construction of the immersed tunnel, including technologies related to the foundation of the immersed tunnel, tube element consisting of several segments under large overburden and serious silting conditions, prefabrication of tube elements, towing and installation of tube elements, and tube elements on curved alignment; 3) Major construction equipment used, including steel cylinder sinking equipment, dredging barges, silt cleaning barges and hydraulic full crosssection formwork equipment. Due to the key technologies described, the problems encountered have been solved and great progress has been achieved.
Key words: Hong KongZhuhaiMacau Bridge (HZMB); artificial island; immersed tunnel; steel cylinder; vibration sinking technology; trench dredging; trench silt cleaning; foundation riprapping and tamping; crushed stone bedding layer; tube element consisting of several segments; tube element prefabrication; large scale formwork equipment; tube towing and installation
YIN Haiqing . Key Technologies Applied in Design and Construction of Artificial Islands and Immersed Tunnel of Hong KongZhuhaiMacau Bridge (HZMB) Project[J]. Tunnel Construction, 2014 , 34(1) : 60 -66 . DOI: 10.3973/j.issn.1672-741X.2014.01.010
/
| 〈 |
|
〉 |