ISSN 2096-4498

   CN 44-1745/U

二维码

Study on Ground Penetrating Shieldbored Tunnel Calculation Parameters in Modified Routine Method

  • ZHANG Yinping
Expand
  • (Shanghai Urban Construction Design & Research Institute, Shanghai 200125, China)

Received date: 2013-12-05

  Revised date: 2014-01-23

  Online published: 2014-02-27

Abstract

Modified routine method is widely used in the calculation of the internal force of shieldbored tunnels, and the calculation parameters are generally selected according to the experience. In the paper, the key calculation parameters of ground penetrating shieldbored tunnel in the modified routine method, i.e., the stiffness reduction ratio (η) and the moment release ratio (ξ), are analyzed on basis of shellspring model, considering the nonlinear relationship between the bending stiffness and axial bending moment of the segment joints. Conclusions drawn are as follows: 1) For shieldbored tunnel with supershallow overburden, the minimum value in the specified range of specifications should be adopted for stiffness reduction ratio (η) and the maximum value should be adopted for the moment release ratio (ξ); 2) When the top of the tunnel is above the ground surface, value 1 should be adopted conservatively.

Cite this article

ZHANG Yinping . Study on Ground Penetrating Shieldbored Tunnel Calculation Parameters in Modified Routine Method[J]. Tunnel Construction, 2014 , 34(2) : 101 -106 . DOI: 10.3973/j.issn.1672-741X.2014.02.002

Outlines

/

〈 〉