Construction Survey of Tanba No. 4 Spiral Tunnel on XiaoheAnkang Highway
Received date: 2013-09-29
Revised date: 2013-11-11
Online published: 2014-02-27
The normal tunnel survey methods and Leica total stations are not suitable for the survey of the crosssection of spiral tunnels. The survey items and geometrical principle of spiral tunnels are analyzed, and nonprism survey distance combined with multifunctional calculation programming and intunnel survey control methods is used to solve the survey problem and to guarantee the breakthrough precision of the spiral tunnel. In the end, the problems have been successfully solved and the survey of Tanba No. 4 tunnel has been successfully completed by using the mentioned technology. Conclusions drawn are as follows: 1) Good intunnel control survey design of the spiral tunnel is a prerequisite for the successful breakthrough of the tunnel; 2) The nonprism survey distance of the total station combined with multifunctional calculation programming is the best way to set out the crosssection of the spiral tunnel.
NIU Chunxia . Construction Survey of Tanba No. 4 Spiral Tunnel on XiaoheAnkang Highway[J]. Tunnel Construction, 2014 , 34(2) : 163 -166 . DOI: 10.3973/j.issn.1672-741X.2014.02.013
/
| 〈 |
|
〉 |