Case Study on Structural Safety of Large Crosssection Tailrace Tunnel of Huangjinping Hydropower Station
Received date: 2013-11-28
Revised date: 2014-01-29
Online published: 2014-03-20
In the paper, the structural safety of the deeplyburied large crosssection tailrace tunnel of Huangjinping hydropower station is evaluated by means of numerical simulation and field monitoring. The result of this study shows: The tunnel is excavated in four benches, and Bench I is excavated by pilot tunneling method, i.e., the pilot is excavated before enlarging excavation is made. In this way, the disturbance to the deep surrounding rock is avoided, because the loose surrounding rock with low stress at the outer ring of the surrounding rock is excavated in the enlarging excavation. Therefore, the excavation method adopted is favorable for the structural safety of the tailrace tunnel. In the process of the excavation and supporting of the large crosssection tailrace tunnel, the maximum tensile stress and the maximum compressive stress of the surrounding rock are 0.86 MPa and 6.9 MPa respectively, and the maximum tensile stress and the maximum compressive stress of the supporting structure are 0.6 MPa and 5.0 MPa respectively. All of the abovementioned values are far less than the allowable stress values, and rock burst would not happen. The surrounding rock and the supporting structure reach stable gradually after the excavation and supporting are finished. The field monitoring results obtained by multipoint displacement gauges verifies the accuracy of the numerical results. The research method described in the paper can provide reference for similar projects in the future.
YI Zerong , YANG Chao , WANG Yusuo . Case Study on Structural Safety of Large Crosssection Tailrace Tunnel of Huangjinping Hydropower Station[J]. Tunnel Construction, 2014 , 34(3) : 216 -220 . DOI: 10.3973/j.issn.1672-741X.2014.03.006
/
| 〈 |
|
〉 |