Analysis on Application of AHP Method in Selection of CutandCover Method
Received date: 2012-10-08
Revised date: 2012-10-23
Online published: 2014-03-20
Not only feasibility, but also construction schedule, economic efficiency and social significance should be considered when bottomup cutandcover method, topdown cutandcover method or semitopdown cutandcover method is selected. In the paper, the selection of the proper construction method for Wusiguangchang station of Qingdao Metro is studied by means of AHP method. The study shows that the semitopdown cutandcover method is the best construction method for the Metro station. The study result agrees with the engineering experience. Analysis is made on the FEM calculation result and the monitoring result, which shows that the semitopdown cutandcover method has good performance and should be the proposed construction method.
ZHU Li , TIAN Haiguang , YUAN Yong . Analysis on Application of AHP Method in Selection of CutandCover Method[J]. Tunnel Construction, 2014 , 34(3) : 243 -248 . DOI: 10.3973/j.issn.1672-741X.2014.03.010
/
| 〈 |
|
〉 |