Case Study on Covered Excavation in Large Crosssection and Shallowburied Tunnel
Received date: 2013-10-22
Revised date: 2014-07-02
Online published: 2014-08-11
Covered excavation methods with and without side piles of shallowburied section of Shilin tunnel and Laoxiao No. 1 tunnel on YunanGuilin railway are presented. Key construction technologies of covered excavation method of large crosssection and shallowburied tunnel are summarized. Applicable conditions of covered excavation method are discussed, and the conditions that mining method can be replaced by covered excavation methods are proposed The mentioned conditions includes: coverspan ratio at normal strata is 0.4 ~ 0.6, and coverspan ratio at karst strata is 0.6 ~ 1.0.
YIN Xueping , TANG Hongning . Case Study on Covered Excavation in Large Crosssection and Shallowburied Tunnel[J]. Tunnel Construction, 2014 , 34(增刊) : 282 -285 . DOI: 10.3973/j.issn.1672-741X.2014.S.043
/
| 〈 |
|
〉 |