Study on Microvibration Blasting Parameters of Largediameter Emptyhole Parallel Cut
Received date: 2014-10-13
Revised date: 2014-12-16
Online published: 2015-02-11
The running tunnel from Taipingjiao Park Station to Yan’an Road Station of No. 3 Line of Qingdao Metro crosses underneath a plastic surgery hospital. In the paper, the blasting parameters under the condition of largediameter empty hole parallel cut, including empty hole diameter, blasting hole number, the space between the firstblasting hole and the empty hole, the detonating delay time and the position of the empty hole, are discussed on basis of theoretical analysis and field test, so as to minimize the influence of the blasting on the existing surface buildings. The results show that the empty hole diameter should be 120~150 mm, 4 blasting holes should be drilled around the empty hole, the distance between the firstblasting hole and the empty hole should be 200~350 mm, and the detonating delay time should be longer than 40 ms.
Key words: Qingdao Metro; parallel cut; empty hole; blasting parameter; vibration
ZHANG Zuyuan , WANG Hailiang . Study on Microvibration Blasting Parameters of Largediameter Emptyhole Parallel Cut[J]. Tunnel Construction, 2015 , 35(2) : 174 -179 . DOI: 10.3973/j.issn.1672-741X.2015.02.012
/
| 〈 |
|
〉 |