Technology for Secondary Lining of Largespan  Flatroof Straightwall Tunnels

  • TIAN Haibo
Expand
  • (Shanghai Urban Construction Design and Research Institute, Shanghai 200125, China)

Received date: 2014-11-21

  Revised date: 2015-01-20

  Online published: 2015-03-20

Abstract

The excavation and secondary lining of flatroof straightwall tunnels with shallow overburden have great risks. In the paper, the applicability of the flatroof straightwall tunnels is analyzed. Three methods for the installation of the secondary lining of flatroof straightwall tunnels are compared in terms of span, excavation method, risk and construction period, with a mined flatroof straightwall underpass of a Metro works as an example. The advantages, disadvantages and application conditions of the mentioned three methods are summarized. The installation method and steps for the secondary lining of mined flatroof straightwall structures under the condition that the support is not removed are proposed. The key points of the design of mined flatroof straightwall tunnels are summarized and the principle for the node treatment is proposed.

Cite this article

TIAN Haibo . Technology for Secondary Lining of Largespan  Flatroof Straightwall Tunnels[J]. Tunnel Construction, 2015 , 35(3) : 268 -273 . DOI: 10.3973/j.issn.1672-741X.2015.03.013

Outlines

/

〈 〉