Dynamic Numerical Analysis on a Metro Station on Line 4 of Beijing Metro Constructed by Shield Method and Shallowcovered Mining Method
Received date: 2014-12-02
Revised date: 2015-02-05
Online published: 2015-04-22
The combination of shield method and shallowcovered mining method can be used to construct Metro stations, so as to improve the availability of shield and to reduce pipeline moving, building removing and traffic rerouting. In the paper, dynamic numerical analysis is made on the construction of a Metro Station on Line 4 of Beijing Metro, which is constructed by means of combination of shield method and shallowcovered mining method, by means of FLAC 3D numerical simulation software. The analysis result shows that the safety of the tunnel and the surrounding environment can be guaranteed, and the construction risks can be brought under effective control.
CHEN Feng . Dynamic Numerical Analysis on a Metro Station on Line 4 of Beijing Metro Constructed by Shield Method and Shallowcovered Mining Method[J]. Tunnel Construction, 2015 , 35(4) : 335 -341 . DOI: 10.3973/j.issn.1672-741X.2015.04.009
/
| 〈 |
|
〉 |