ISSN 2096-4498

   CN 44-1745/U

二维码

Design of Seamless Transfer between Metro Station and Bus:Case Study on Financial HiTech Zone Station on GuangzhouFoshan Line

  • WANG Yang
Expand
  • (Real Estate Head Office of Guangzhou Metro Corporation, Guangzhou 510000, Guangdong, China)

Received date: 2015-01-13

  Revised date: 2015-03-12

  Online published: 2015-04-22

Abstract

The quality of transfer between Metro station and bus will be improved if a good transfer design can be made. In this paper, the development trend and design principle of seamless transfer between Metro station and bus are analyzed, and the basic design principle is discussed. The transfer design of Financial HiTech Zone station on GuangzhouFoshan Line is discussed. The design principles include nonstop transfer, humanization and safety. The design policies include shortening the transfer distance, ventilation mode selection and firefighting design.

Cite this article

WANG Yang . Design of Seamless Transfer between Metro Station and Bus:Case Study on Financial HiTech Zone Station on GuangzhouFoshan Line[J]. Tunnel Construction, 2015 , 35(4) : 354 -358 . DOI: 10.3973/j.issn.1672-741X.2015.04.012

Outlines

/

〈 〉