ISSN 2096-4498

   CN 44-1745/U

二维码

Fluidstructure Interaction Analysis on Ventilation Passage of Metro Works Constructed by 10pilotheading CRD Method

  • SUN Mingzhi ,
  • DAI Wenting ,
  • HAO Baizhou ,
  • WU Hao
Expand
  • (School of Transportation, Jilin University, Changchun 130022, Jilin, China)

Received date: 2014-08-27

  Revised date: 2014-11-06

  Online published: 2015-02-09

Abstract

The ventilation passage of Jiefangdalu Station of Changchun Metro is constructed by 10pilotheading CRD method. In the paper, the construction of the ventilation passage is simulated by means of fluidstructure interaction, so as to control and predict the construction risks effectively. Conclusions drawn are as follows: 1) The proposed two pilot heading sequences are compared in terms of ground surface settlement, sidewall convergence, primary support stress and plasticized zone distribution, and rational pilot heading sequence is found accordingly; 2) Two of the simulation results, i.e., vertical displacement and horizontal convergence, are selected and analyzed, which shows that the removal of the bottom temporary support and the temporary invert are vulnerable construction steps. Countermeasures are proposed for these vulnerable construction steps according to the specific project conditions.

Cite this article

SUN Mingzhi , DAI Wenting , HAO Baizhou , WU Hao . Fluidstructure Interaction Analysis on Ventilation Passage of Metro Works Constructed by 10pilotheading CRD Method[J]. Tunnel Construction, 2015 , 35(1) : 22 -27 . DOI: 10.3973/j.issn.1672-741X.2015.01.004

Outlines

/

〈 〉